SERVICE — CONSTRUCTION

Precision engineering,zero-defect delivery

DATA CENTER CONSTRUCTION

From structured cabling and equipment installation through to testing and acceptance, we follow the design specification to the letter — so every stage lands exactly as drawn, and the facility reaches your hands on time and without defects.

0+
Years of build experience
0+
Projects delivered
0h
Burn-in stress testing
0 days
AVERAGE DELIVERY
Typical build cycle
0%
DEFECT-FREE RATE
First-pass acceptance
0+
PARTNER VENDORS
Approved subcontractors
0×7
SITE SUPPORT
On-site response cover
SERVICE PILLARS

Four core service pillars

01
📋
Site Management

A rigorous project management methodology coordinates civil, MEP and IT contractors, keeping every construction stage built to drawing, transparent on progress and controlled on quality — from groundbreaking to handover.

📊

Progress control

Daily site logs and a live progress dashboard let owners check status at any time.

🏗

Multi-vendor coordination

One point of contact integrating HVAC, power, low-voltage and fire protection contractors.

🛡

Quality assurance

Inspection and test plans (ITP) at every work stage keep quality aligned to specification.

Site management scope checklist

  • Pre-construction drawing review and BIM clash detection
  • Safety induction training and permit applications
  • Work breakdown structure (WBS) creation and tracking
  • Daily site walks and defect management
  • Material inspection on delivery and storage control
  • Subcontractor performance review and coordination meetings
  • Change order management
  • Milestone gate review reporting
  • Punch list execution and close-out

PROJECT INSIGHT

We run a digital site management platform: every inspection record, photo and report is uploaded in real time, so owners can review from a phone — dramatically cutting communication round trips.

40%
Faster communication
0
Documents lost
02
🔌
Structured Cabling

Structured cabling installed to TIA-568 / ISO 11801, from backbone fibre to endpoint copper. Every link is tested and certified, so transmission performance meets the design specification.

🔆

Fibre installation

OM4 multimode / OS2 singlemode splicing and pre-terminated assemblies, OTDR verified throughout.

🧵

Copper distribution

Cat6A U/FTP to the endpoint, supporting 10GbE with permanent link channel certification.

🏷

Labelling & records

ANSI/TIA-606 identification standard paired with an electronic cable management database.

Structured cabling scope checklist

  • Backbone fibre route planning and pathway installation
  • MDA / HDA / EDA patch frame installation
  • OM4 / OS2 fibre splicing and testing
  • Cat6A endpoint copper installation and termination
  • Segregated power and data pathway installation
  • Cable tray and ladder rack installation
  • OTDR fibre test report issuance
  • Fluke DSX / Versiv copper certification testing
  • Cable management database build and handover

PERFORMANCE SPEC

All copper channels must certify to TIA-568-C.2 Cat6A permanent link, and fibre insertion loss must beat the design value by 0.5 dB — so upgrading to 25G/40G later needs no recabling.

100%
Channel certification
25G
Ready by design
03
🖥
Equipment Installation

From racking and cable dressing to system initialisation, every device is installed against a factory pre-staging plan — avoiding improvised on-site decisions and accelerating time to production.

🗄

Server racking

Rail installation, cable management, BIOS / IPMI initial configuration and burn-in testing.

🌐

Network deployment

Switch / router / firewall racking, base configuration, VLAN setup and connectivity testing.

💾

Storage integration

SAN / NAS / all-flash array installation, HBA setup, LUN planning and host connectivity validation.

Equipment installation scope checklist

  • Factory pre-staging test before installation
  • Rack rail installation and equipment mounting
  • A/B power path connection verification
  • KVM / console server integration and setup
  • IPMI / iDRAC / iLO out-of-band management setup
  • OS installation and firmware updates
  • HBA / NIC / GPU driver installation and validation
  • 72-hour burn-in stress testing
  • Asset register (CMDB) creation

PRE-STAGING ADVANTAGE

Factory pre-staging completes 80% of configuration before equipment ships, cutting on-site installation time by an average of 60% and sharply reducing the risk of operator error in a live facility.

60%
Less on-site time
99%
First-boot success
04
Testing & Acceptance

On completion we run systematic integration testing covering power transfer, cooling performance, network connectivity and access control, then issue the full as-built documentation so the facility transfers in optimal condition.

Power transfer testing

Simulated utility failure verifying UPS transfer < 10 ms and generator start < 30 s.

🌡

Thermal imaging survey

Infrared thermography under full load confirming no hot spots or cooling blind zones.

📄

As-built handover

As-built drawings, operating manuals, warranty schedule and training, delivered in full.

Testing and acceptance checklist

  • FAT factory acceptance testing (pre-shipment)
  • SAT site acceptance testing (post-installation)
  • UAT user acceptance testing (owner confirmation)
  • UPS discharge and transfer time measurement
  • Power quality analysis (harmonics, voltage stability)
  • Full-load stress testing (72 hours continuous monitoring)
  • Network loop testing and SLA baseline establishment
  • Fire / access control / CCTV integration testing
  • As-built drawings and maintenance manual delivery

DOCUMENTATION PACKAGE

Once acceptance passes we hand over a complete facility package — as-built drawings for every system, configuration backups, warranty schedules and SOP operating manuals — so ongoing operations start on solid ground.

100%
Documentation handed over
1yr+
Post-handover support
WORKFLOW

Six phases of standard construction

01
PHASE 01
Requirements & design review
Review the design set, confirm construction specifications and hold the kick-off coordination meeting to settle every technical detail.
3–5 working days
02
PHASE 02
Site preparation & MEP first fix
Raised floor, cable tray and distribution board installation, preparing the physical environment for equipment arrival.
1–2 weeks
03
PHASE 03
Structured cabling installation
Backbone fibre splicing, copper termination and labelling, with every channel certified on completion.
1–3 weeks
04
PHASE 04
Equipment delivery & racking
Equipment racked to the pre-staging plan, with power connections, network links and base configuration completed.
1–2 weeks
05
PHASE 05
System integration testing
Power transfer testing, cooling validation, network connectivity checks and a 72-hour full-load stress test.
1 week
06
PHASE 06
Acceptance, handover & training
Owner acceptance sign-off, as-built documentation delivery and operations team training ahead of formal handover.
2–3 working days
COMPLIANCE

Built to international standards

Anchor Data Insfrastructure Corporation's construction procedures follow international data center and information security standards. Our engineers hold the relevant professional certifications, so every build can withstand third-party audit.

🏛
TIA-942
Data center infrastructure standard
🔐
ISO 27001
Information security management
📡
TIA-568
Structured cabling systems
🌿
EN 50600
EU data center standard
NFPA 75
Fire protection for IT equipment
🎓
CDCP
Certified data center professional
START A PROJECT

Ready to break ground?

Send us your design set and target date. We will come back with a construction approach, an indicative programme and a clear scope of work.